Cable Plough

The equipment we use together with our highly skilled teams to operate the equipment leads to fast, efficient laying of cables and more importantly minimal ground damage. The pictures below follow are past projects within the utilities industry, our main cable laying is for wind turbines all over the UK.

 

Latest Work

Jersey to Normandie Link Jersey to Normandie Link

Marine Cable for GPC

More Info...

 

Tower Regeneration Machine PowerTower Regeneration Machine Power

Laying cable around the Tower Regeneration site to power the Hargreaves electric machinery.

More Info...

 

Pen y Cymoedd Wind Energy ProjectPen y Cymoedd Wind Energy Project

The project is a 78 turbine development, Our task was installing the 132kv ducts for the grid connection cross country 3.4 k twin circuit.

More Info...

 

Spurn PointSpurn Point

4.2 k of 11kv ducting and 64 mm water main. We had to work in between tides on a ssi sand bank looket after be natural England and rspb.

More Info...

 

Gwynt y Môr Offshore Wind FarmGwynt y Môr Offshore Wind Farm

Gwynt y Môr Offshore Wind Farm working for GPC laying cable at a 2mtrs depth on the sand beach.

More Info...

 

Maerdy Wind FarmMaerdy Wind Farm

6.7 km of cabling on peat land the Cable Plow has low ground pressure for working in wet ground.

More Info...

 

Previous Work

  • MOD

    This job was to lay 7 KM of Fibre Optic Cable for the MOD in the South of England.

    More Info

  • Offshore Wind Farm

    North Wales GPC offshore wind farm.

    More Info

  • Goole Wind Farm

    12 KM of 33kv cable at the Goole Windfarm for RWE Balfour Beatty.

    More Info

  • Blaengwen Up hill Cable Plough Work

    Blaengwen Up hill

  • Blaengwen Up hill Cable Plough Work

    Ransom Moor Project

  • Blaengwen Up hill Cable Plough Work

    Blaengwen Project

  • Blaengwen Up hill Cable Plough Work

    Our old Spider Plow

  • Blaengwen Up hill Cable Plough Work

    Wind farm project

  • Blaengwen Up hill Cable Plough Work

    Plough in action

  • Blaengwen Up hill Cable Plough Work

    Test Hole 2

  • Blaengwen Up hill Cable Plough Work

    Challenger

  • Blaengwen Up hill Cable Plough Work

    Manchester

Cable Installation History

Year Project Voltage KM Client
2015 strawberry line yatton 11kv Keir. / WPD
2014 Darby 33kv Morgan sinddol /wpd
2014 Trevone Carmarthen   11kv Balfour Beatty /wpd
2014 St Florence haverford west. 11kv Balfour /Beatty /wpd
2014 Bridge water 11kv Keir.  / wpd
2014 Bailiwick jersey. 132kv GPC/ prysmain
2014 Mynydd bwfad. 33kv Power systems. /Walters
2014 Blauan Wayne 11kv Balfour Beatty /wpd
2014 Avon mouth   Bristol. 11kv Keir  /wpd
2014 Spurn point Humber gate. 11kv Npg / interserve
2014 Normandy france. 132kv GPC. / prysmain
2014 Pen y comoedd 132kv Balfour Beatty /wpd
2014 PV park whiteland. 33kv Balfour Beatty /wpd
2014 burton woods. 33kv Morgan sinddol/wpd
2013 Dalbol Lakes - Dartmoor 11kv Balfour Beatty / WPD
2013 Gym Wind Farm - 4th phase 132kv GPC
2013 Wilton  Devon 33kv 4.5km Balfour Beatty / WPD
2013 Gym Wind Farm - 3rd phase 132kv GPC
2013 Triscome Devon 33kv 2.7km Balfour Beatty / WPD
2013 Gym Wind Farm - 2nd phase 132kv GPC
2013 Maerdy grid connection 33kv 1.8 km Balfour Beatty / WPD
2013 Carlisle Over Lay 33kv 7.4 km murphys/ northen power
2013 Maerdy Wind Farm 33kv 6.7 km blackwell/ power systems
2013 Goolefeilds Connection 33kv 1km Interserve
2012 Gym Wind Farm - 1st phase 132kv GPC
2012 Alltwalis Wind Farm 33kv Statkraft
2012 Devon Ilfracombe 33kv SSE
2012 Taugnton Cable Diversion Balfour Beatty / WPD
2012 Weston Super-Mare 11 KV 3.8 KM Balfour Beatty / WPD
2012 Qinetiq Fibre Optic 7 KM  
2012 Scottish Water   13 KM  
2012 Goole 33kv 12 KM RWE
2012 Greater Gabbard   GPC
2012 Qinetiq Pendine    
2012 Qinetiq Aberporth 11kv 1.5 KM SSE
2011 Glyndbourne wind project 11kv SSE
2011 Pendine 11kv Qinetic
2011 Altwallis wind farm 33kv SSE
2011 Swansea University 11kv SSE
2010 Tweene bridge diversion 11kv 3.5 KM YEDL
2010 Altwallis wind farm Fibre optic Statkraft
2010 Doncaster undergrounding o/head cables 11 kv 3.5 KM YEDL / MURPHY
2010 Bein an Tuiric phase 2 33kv 16 KM SSE
2010 Eaton College Pumped mains 1 KM Eaton College
2009 Dinas Dam LV 1KM Statkraft
2009 Blaengwen wind farm 33kv 5 KM Swalec
2009 Blaengwen wind farm connection 132kv 1 KM swalec
2009 Bishopstone AONB 11KV 3 KM EDF
2009 Polesden Lacey AONB 11KV 1 KM EDF
2009 Holme wood commonAONB 11KV 2 KM EDF
2009 Brightling down AONB 11KV 2 KM EDF
2009 Brightling down (2) AONB 11KV 2.5 KM EDF
2009 Coombe Farm AONB 11KV 2.5 KM EDF
2009 Greensand way AONB 11KV 2 KM EDF
2009 Abinger hammer AONB 11kv 2 KM EDF
2009 Jevington Hill AONB 11KV 3KM EDF
2009 Warnham Park AONB 11KV 1.8 KM EDF
2008 Losely park AONB 11KV 3.5 KM EDF
2008 Cobham 11kv 2.5 KM EDF
2008 Birling gap AONB 11KV 4.8 KM EDF
2008 Bicker fen wind farm 33kv 6 KM Carter civil engineering
2008 Ranson moor wid farm phase 1 33kv 3 KM Econnect construction
2007 Craig farm wind farm 33kv 3 KM Econnect construction
2007 Snowdonia National park 11kv 5 KM Scottish power
2007 Ranson moor phase 2 33kv 3 KM RG Carter
2007 Kilbraur wind farm 33KV 11 KM RJ MCLEOD
2006 Kilgarven wind farm 122kv 9 KM SEC
2006 Scout moor wind farm 33kv 22 KM McNicholas
2006 Tangy 33kv 4 KM SEC
2002-05 ESB SERVICE WORK 22KV AND 66 KV 75 KM SOUTHERN IRELAND
2003 St Melons Cardiff 132KV ducks 3.5 KM Balfour Beatty
2001 FRANCE EDF SERVICE WORK 11KV AND 33 KV 47 KM EDF FRANCE
2000 Beinn an Tuirc 33kv 16 KM SEC